•  
  •  
 

Journal of Transportation Management

Abstract

The objective of this study is to examine factors influencing delivery lead time in a manufacturing environment. It presents the results of a survey of the electronic and other electrical equipment and components industry' in California to illustrate the relative importance of these factors in delivery time reduction. The degree of importance of each factor is then compared with the extent of emphasis the survey participants actually placed on the factor in attempting to reduce delivery lead time.

DOI

10.22237/jotm/841536120

Share

COinS