•  
  •  
 

Abstract

The ITSACORR method (Crosbie, 1993, 1995) is evaluated for the analysis of two-phase interrupted time-series designs. It is shown that each component of the ITSACORR framework (including the structural model, the design matrix, the autocorrelation estimator, the ultimate parameter estimation scheme, and the inferential method) contains fatal flaws.

DOI

10.22237/jmasm/1193889780

Share

COinS